Teoksen THE CROSBYTON SOLAR POWER PROJECT (PHASE I), AN INTERIM TECHNICAL REPORT OF WORK ACCOMPLISHED FROM SEPTEMBER 1, 1976 TO FEBRUARY 18, 1977 tekijä
Tekijän teokset
CROSBYTON SOLAR POWER PROJECT PHASE I, ANALOG DESIGN VERIFICATION SYSTEM PRELIMINARY PERFORMANCE RESULTS 2 kappaletta
THE CROSBYTON SOLAR POWER PROJECT, PERFORMANCE AND COST OF SOLAR GRIDIRON ELECTRIC POWER PLANTS 2 kappaletta
PRELIMINARY DESIGN OF 5-MWE SOLAR-FOSSIL HYBRID ELECTRIC POWER PLANT AT CROSBYTON, TEXAS 2 kappaletta
Helios [Periodical] 1 kappale
Oral History: Frank Nicholas 1 kappale
Merkitty avainsanalla
Yleistieto
There is no Common Knowledge data for this author yet. You can help.
Jäseniä
Kirja-arvosteluja
Tilastot
- Teokset
- 15
- Jäseniä
- 29
- Suosituimmuussija
- #460,290
- Kirja-arvosteluja
- 7
In this report the work performed in Segment I of Phase I of the Crosbyton Solar Power Project (CSPP) is described. The period of performance was 18 months, from September 1, 1976 to February 2, 1978. The work of the first six months by Texas Tech University, with E-Systems, Inc., was reported in Volumes I, II, and III, the Interim Technical Report of February 19, 1977. The present report is a continuation of that report so that details from that report will not be repeated here. This report is organized into two volumes: IV and V. Volume IV is an overview of the work and results of Segment I and is supported by Volume V, a collection of appendices summarizing the research program.… (lisätietoja)