ABSTRACT:
Capital cost estimates have been prepared for oil-fueled, high efficiency combined gas turbine/steam turbine power plants in five regions of the United States: Great Lakes, Southwest, Western (at two locations), Northeast, and Southeast. These plants are designed to burn liquid fuels, either distillate (kerosene and No. 2 distillate) or ash-bearing (blended residuals, crudes, and heavy residuals).

Plants have either a nominal net combined power output of 250 MWe for a single unit installation or 500 MWe for a two unit installation consisting of two 250 MWe units. All plants are designed to meet present day environmental regulations, EPA New Source Performance Standards; and in addition, one of the Western plants--located in the Southern California Metropolitan Area (Los Angeles)--is designed to meet the special pollutant limitations in that area.

Capital costs for the 250 MWe plant expressed in 1976 dollars range from $306/kW for a Southwestern plant burning distillate fuel to $417/kW for a remote Western plant burning residual fuel. The costs in $/kW for the 500 MWe plants are about five percent lower. Cost estimates were based on information from recent and current construction projects for both conventional and combined cycle plants, and incorporate present day criteria regarding releases to the environment. The costs also include an allowance for funds during construction and other owner costs.

Trends in future development of combined cycle plants are also discussed.
… (lisätietoja)
 
Merkitty asiattomaksi
SandiaCSP | Nov 16, 2022 |
ABSTRACT:
Capital cost estimates have been prepared for 100MW coal-fired power plants in four regions of the United States: Northeast, Southeast, Great Lakes, and Western. The plants were designed to burn regionally representative coals. For the Great Lakes location, cost estimates were made for both Illinois and Wyoming coals. For the Western location, two Wyoming coal-fired plants were studied, one designed to EPA new source performance standards and the other designed to New Mexico emission standards. The effect of building the plant on a remote site was also studied for the Western location. Capital costs for twin 500MW units, expressed in 1976 dollars, ranged from 683 $/kw for a Southeastern plant burning Kentucky coal to 1,001 $/kw for a remote Western plant conforming to New Mexico standards. The cost of a single 1,000MW unit is not significantly lower. The cost estimates were based on information from the contractor's current construction projects.… (lisätietoja)
 
Merkitty asiattomaksi
SandiaCSP | Nov 1, 2022 |